How we work
From first message to handover
Ten stages, in the order they happen. We have deliberately not attached durations to them — timelines depend on the scope of your kitchen, and a number published here that we then miss is worse than no number at all.
- 01
Enquiry
You send your city, room details and what you are looking for — by WhatsApp, phone, or the requirement builder on this site.
- 02
Initial consultation
We talk through how you cook, what you store, who uses the kitchen and what you want it to look like. This shapes everything that follows.
- 03
Site measurement
We measure the room properly: wall lengths, ceiling height, window and door positions, plumbing points, electrical points, beams and level variations.
- 04
Requirements and budget
With the measurements in hand, we agree the scope and the specification level so the design is drawn to something realistic from the start.
- 05
Design proposal
You receive a layout with cabinet positions, storage allocation and elevations, so you can see how the kitchen works before anything is made.
- 06
Material selection
Carcass material, shutter finish, edge detail, handles, hardware and any profile or glass work are confirmed against physical samples.
- 07
Manufacturing
Cabinets are cut, edge-banded and assembled to the approved drawings, with hardware fitted and shutters finished to the agreed specification.
- 08
Installation
Units are installed and levelled on site, shutters aligned, hardware adjusted, and countertop and appliance cut-outs coordinated.
- 09
Handover
We walk the finished kitchen with you, check every door and drawer, explain how the mechanisms work, and clear the site.
- 10
After-sales support
Hinges and drawers can need adjustment once a kitchen is in daily use. Contact us and we will arrange for it to be looked at.
Working together
What makes a project go well
The kitchens that turn out best are the ones where these four things happen. None of them cost anything.
-
Be honest about how you cook
Not how you would like to cook. If the pressure cooker comes out five times a week, the storage plan should reflect that rather than an aspirational one.
-
Involve the people who use it
Counter and wall-cabinet heights should suit whoever spends most time in the kitchen. This is difficult to fix afterwards and free to get right beforehand.
-
Decide appliances early
Model numbers before manufacturing means cabinets that fit first time. Model numbers afterwards means cutting cabinets on site.
-
Be thorough at approval
The drawing stage is when questions are free. Ask everything then — after cabinets are cut, a change means remaking parts.
On timelines
Why there are no week counts on this page
A kitchen's timeline depends on its size, its finish, whether any civil or plumbing work is needed, and how quickly material selection is settled. Those vary enough between projects that a single published figure would be misleading for most of them.
So we do it the other way round: once the room is measured and the scope agreed, you get a timeline for your kitchen — one we have committed to rather than one taken from a website.
Stage one
Start with a message
Your city, roughly what you need, and the room dimensions if you have them. That is enough for a useful first conversation.